Call: 330-828-1010
Email: info@zimmermansteel.com
Zimmerman Steel & Supply

Zimmerman Steel & Supply Specializes inTotal Production Metal Fabrication & Production Welding Services

Production Welding of Conveyor Parts for the Material Handling Industry

Since 1995, Zimmerman Steel & Supply has been a trusted resource for many industries, including material handling, providing the design and manufacture of custom fabricated products such as conveyor parts. We offer extensive manufacturing capabilities that include welding and stamping, along with several secondary operations, including tapping and deburring, to provide customers with full-service fabrication.

Using our 18 years of cumulative experience, our skilled operators apply this expertise to work with the latest technology, including stamping presses, robotic welders and drill tube punches, to manipulate hot rolled and steel tube, along with sheet metal 15 GA, into finished products. We manufacture 50,000 parts per month measuring 1 ¼" thickness, 26 7/8" height and 26 ½" widths, while achieving a tolerance of ±.005". Then, to ensure these parts meet customer specifications, our quality team performs continual visual and measurements testing throughout the entire process. These parts are finished with Zinc Chromate plating ASTM B633-98 Fe/Zn 5 type III to protect against excessive wear in harsh environments and then shipped to locations across the continental United States. Because of our quick response times, the whole process from order to delivery typically is four to six weeks.

To learn more about this project, or to discuss a similar project, contact us today.

Production Welding of Conveyor Parts for the Material Handling Industry Project Highlights

Product Name
Conveyor Parts
Capabilities Applied/Processes
Primary:
  • Welding
  • Stamping
Secondary:
  • Drilled
  • Tapped
  • Plating
  • Deburred
Equipment Used to Manufacture Part
Stamping Press, Robotic Welder, Drill Tube Punch
Expertise
18 years cumulative experience
Overall Part Dimensions
Thickness: 1 ¼"
Highest Height: 26 7/8"
Width: 26 ½"
Tightest Tolerances
±.005"
Material Used
Hot Rolled and Steel Tube
Sheet Metal 15 GA
Material Finish
Zinc Chromate plating ASTM B633-98 Fe/Zn 5 type III
In process testing/inspection performed
Continual visual and measurement testing
Industry for Use
Material Handling
Volume
50 K pieces per month
Delivery/Turnaround Time
Four to six weeks
Delivery Location
Continental US
Standards Met
Customer Specifications, 2D CAD Drawing